HomeAboutServicesProcessBlogContactGet Started →

Real projects.
Real results.

A closer look at how we've taken products from idea to production.

💳
FinTech

FinStackFrom idea to production in 6 weeks

Challenge

FinStack needed a production-ready platform fast, without stitching together separate agencies for design, development, and DevOps.

Solution

3D³ ran design, development, and deployment as one team — Figma to Kubernetes cluster, with weekly demos throughout.

Result

Launched in 6 weeks. DevOps automation now saves 40+ engineering hours every month.

"The DevOps setup alone is still saving our team 40+ hours a month — I wasn't expecting a team this size to move that fast." Arjun Mehta, CEO
🛒
E-Commerce

CloudRetailZero-downtime Kubernetes migration

Challenge

CloudRetail's infrastructure couldn't handle traffic spikes, and monitoring was minimal.

Solution

Migrated to a Kubernetes-native architecture with full observability (Prometheus + Grafana) and autoscaling.

Result

Zero downtime during migration. Infrastructure costs dropped 35% afterward.

"I went in expecting at least some downtime. We had none, and our infra costs are down 35% since — that's the number I still bring up in board meetings." Sarah Williams, CTO
🎓
EdTech

EdTechProDesign-to-launch, 3 weeks ahead of schedule

Challenge

EdTechPro needed a polished, investor-ready product experience under a tight fundraising deadline.

Solution

Ran design and development in parallel sprints with continuous stakeholder review.

Result

Shipped 3 weeks ahead of schedule with a launch-ready, investor-facing product.

"The design work speaks for itself, but what actually surprised me was the pace — it never once felt rushed." Priya Nair, Founder

Want results like these?

Let's talk about what you're building.